Engineering Feasibility Study

Ensure project clarity, reduce risk, and build with confidence.

Engineering Feasibility Study

Engineering Feasibility Study Services

Test the options before you invest.

Understand whether a proposed facility or modification can meet its technical and commercial objectives. Teckniv evaluates process options, site conditions, equipment requirements and cost drivers to support an informed project decision. The study identifies what is feasible, what remains uncertain and what must be resolved before engineering progresses.

Who we support

Owners and project developers evaluating an investment, and EPC or PMC teams checking whether an expansion or modification is practical before committing to design and procurement.

Discuss your project
Engineering Feasibility Study Services illustration
Engineering Feasibility Study Services • India & international projects

01 / Engineering capabilities

Capabilities shaped around your project.

The scope is agreed around the decisions, interfaces and engineering outputs your team needs. These work areas can be combined into a defined package.

Technical feasibility

Assess process routes, capacity requirements, preliminary equipment sizing and utility availability. Compare the implications of alternative configurations for performance and operability.

Site and infrastructure assessment

Review plot availability, access, existing services and major connection requirements. Identify site investigations and environmental or statutory inputs that the project will need.

Economic evaluation

Develop preliminary capital and operating cost inputs around a documented scope and assumptions. Highlight the variables that could materially change the project case.

Risk and decision support

Assess technical and execution risks, resource constraints and possible mitigation measures. Present the findings in a format that supports option selection or further investigation.

02 / Your engineering package

Clear deliverables. Ready for the next team.

The deliverable list is agreed at the start. Each issue identifies its purpose, revision and outstanding inputs for the next project stage.

  • Feasibility report and option comparison
  • Preliminary design basis and flow schemes
  • Equipment and utility estimates
  • Site and infrastructure constraints summary
  • Preliminary CAPEX and OPEX inputs
  • Risk assessment and next-stage recommendations

03 / How we work

A clear route from requirement to handover.

We establish the design basis first, then develop and review the package with your project team.

  1. 01

    Agree the requirement

    Define the decision the feasibility study must support.

  2. 02

    Develop the package

    Assess the technical options and site constraints.

  3. 03

    Review & coordinate

    Evaluate the principal cost drivers and uncertainties.

  4. 04

    Issue & hand over

    Present findings, limitations and recommended next steps.

04 / The technical context

Aligned with your facility and requirements.

The equipment duty, project location and client standards determine the methods, platforms and acceptance criteria.

Industries & applications

Industrial process facilities, utilities, power, chemical manufacturing and water treatment. Studies can address a new site, additional production capacity, a process change or reuse of existing infrastructure.

Software & digital delivery

Engineering calculations, preliminary layouts and cost-comparison schedules are selected to suit the decision being assessed. The study records data sources, estimate assumptions and the basis of comparisons so the results can be reviewed and updated.

Standards & design basis

The assessment identifies relevant planning, environmental, safety and engineering requirements. It distinguishes a review of potential approval needs from obtaining permits or producing a final code-compliant construction design.

05 / Before you begin

Frequently asked questions

Practical answers to common scope and coordination questions.

Is a feasibility study a detailed design package?
No. It establishes whether and how the project should proceed. Detailed drawings and construction quantities are developed later against an approved design basis.
Can existing facilities be assessed?
Yes. Revamps and capacity increases can be assessed using operating data, existing equipment information, utility margins and physical site constraints.
How are project costs presented?
Cost inputs are tied to the study scope, available quantities, pricing basis and assumptions. Major exclusions and uncertain cost drivers are stated so that an early estimate is not mistaken for a final project budget.
What happens if an option is not feasible?
The report explains the limiting factors and, where within scope, compares alternative capacity, technology, location or utility arrangements. Recommendations identify whether further investigation or a different development route is appropriate.