Define the project before committing to detailed design. Teckniv develops the early engineering basis needed to compare concepts, identify constraints and prepare a workable FEED scope. We support EPC contractors, consultants and asset owners on greenfield developments, plant modifications and capacity expansions in India and international markets.
Who we support
Asset owners assessing a new facility or expansion, and EPC or PMC teams that need a defined scope before FEED begins. This is especially useful when capacity targets are known but process options, site constraints or battery limits are still being resolved.
Pre FEED Engineering • India & international projects
01 / Engineering capabilities
Capabilities shaped around your project.
The scope is agreed around the decisions, interfaces and engineering outputs your team needs. These work areas can be combined into a defined package.
Concept and scope definition
Translate production targets, feed conditions and site limitations into a preliminary facility concept. Establish battery limits, key interfaces and the studies needed before the next investment decision.
Preliminary technical development
Prepare process flow schemes, initial equipment requirements, utility estimates and layout concepts. Identify the data still needed to develop reliable design quantities and specifications.
Cost and execution inputs
Develop early cost inputs and engineering assumptions with their basis clearly recorded. Review construction access, existing-plant interfaces and modularization opportunities where relevant.
Risk and option review
Compare technical alternatives against operability, safety, utilities, plot space and execution constraints. Record unresolved issues so they remain visible as the design develops.
02 / Your engineering package
Clear deliverables. Ready for the next team.
The deliverable list is agreed at the start. Each issue identifies its purpose, revision and outstanding inputs for the next project stage.
✓Preliminary design basis and scope boundaries
✓Concept comparison and recommended development route
✓Process flow schemes and preliminary layouts
✓Equipment and utility requirement summaries
✓Cost inputs and assumptions register
✓Risk register and proposed FEED deliverable list
03 / How we work
A clear route from requirement to handover.
We establish the design basis first, then develop and review the package with your project team.
01
Agree the requirement
Review the project objectives and available information.
02
Develop the package
Develop feasible concepts and identify missing inputs.
03
Review & coordinate
Compare alternatives with the client and record selection criteria.
04
Issue & hand over
Issue the agreed concept basis and the work required for FEED.
04 / The technical context
Aligned with your facility and requirements.
The equipment duty, project location and client standards determine the methods, platforms and acceptance criteria.
Industries & applications
Process plants, oil and gas facilities, chemical manufacturing, power and utility systems, and water and wastewater projects. Typical applications include greenfield concepts, brownfield expansions and early modularization studies.
Software & digital delivery
Concept drawings, preliminary engineering calculations and option-comparison schedules are prepared in the formats agreed with the client. The modeling or simulation platform is selected around the process question and available inputs; a detailed 3D model is not assumed at this stage.
Standards & design basis
The study identifies applicable discipline codes, local requirements, client specifications and safety-review needs for the next phase. Code editions and outstanding approval requirements are recorded in the developing design basis.
05 / Before you begin
Frequently asked questions
Practical answers to common scope and coordination questions.
How is Pre FEED different from FEED?+
Pre FEED helps select and define the concept. FEED develops that selected concept into a coordinated engineering package for approval, procurement planning and tendering.
How are risks carried into the next engineering phase?+
The study records the issue, its possible design or execution effect and the investigation or decision needed to resolve it. The open-action register forms part of the handover so assumptions are not lost between teams.
What decisions should Pre FEED help us make?+
The package should support selection of a development concept, definition of scope boundaries and identification of the investigations needed before FEED. Options are compared with their technical assumptions and remaining uncertainties visible.
Can the study start with incomplete site information?+
Yes, provided the missing information is logged. Preliminary assumptions can support an option study, while survey, geotechnical, utility or operating data required to confirm the concept are identified as follow-up actions.