Operating-event assessment
Define credible pump trips, starts, valve operations and other changes in flow. Review the event sequence and the operating state from which each case begins.
Surge Analysis Services
Rapid changes in liquid flow can create pressure transients in pipelines and pumping systems. Teckniv supports surge-analysis studies to examine operating events, identify governing pressure conditions and compare protection options before design or operating decisions are finalized.
Pipeline designers, EPC contractors, pump-system engineers, utilities and plant owners reviewing liquid-transfer systems.
01 / Engineering capabilities
The study scope is agreed around your engineering question, available inputs and required decisions.
Define credible pump trips, starts, valve operations and other changes in flow. Review the event sequence and the operating state from which each case begins.
Examine maximum and minimum pressures and time histories at selected locations. Identify cases that need closer review against the system design basis.
Compare agreed measures such as valve operating strategies, surge vessels or relief arrangements. Assess their effect within the modeled system and specified scenarios.
Document the assumptions and equipment data behind the study. Coordinate findings with pipeline, pump, valve and piping teams for the next design stage.
02 / Your engineering package
Deliverables and file formats are agreed at the start of the study.
03 / How we work
Review the network, design limits and credible operating events.
Build the hydraulic model and check its starting conditions.
Simulate agreed transient cases and compare protection options.
Issue results and coordinate requirements with the design team.
04 / Technical context
Water-transfer lines, pumping stations and industrial liquid-piping networks. System boundaries and fluid assumptions are established for each assignment.
A suitable hydraulic transient solver is selected for the agreed system. Pump, valve and protection-device behavior is based on the available data and documented assumptions.
The project design basis defines allowable conditions and the cases to be assessed. Any protection-device selection or operating change is coordinated with the responsible design and equipment teams.
05 / Before you begin